Monday, 9 February 2015

OMG I'm Back!

Wow, almost 4 months later and time for another post!

A thousand apologies, but in between starting a new job in October, Christmas and New Years and my beloved game of Cricket (Go the Blackcaps) the limited time I have had available to me has been spent at the beach or actually working on my layout as opposed to writing about it!

Now, I'm not promising any future surge of blog updates, but I will get a few more out over the next couple of weeks catching everyone up on progress.

This first post back is just a quick update really and as you can see from the below post, there has been quite a bit of work done.

Completed Trackwork


All of the track work has been completed! Trains run! Woohoo!

Probably the biggest single achievement to date IMO. One small snag though, I discovered that 75% of my hoarded rolling stock will need to have the wheel-sets replaced with low profile wheels. Luckily I hadn't started converting couplers yet (I will be using knuckle as opposed to the rapido type which most of them have), so by replacing the entire truck assembly I can kill two birds with one stone. Long term project! I have enough that are fine to keep me happy for the moment.

Completed Track-work


I also attempted to DIY some under track decouplers using rare earth magnets as you can see in the bottom picture; while they aren't particularly obvious from the photo, basically the magnets are attached to a washer in opposite polarities. It's pretty hit and miss, and my advice to anyone thinking about doing it is don't bother. before I ballast, I will take them all out. It was a good experiment, but not a keeper.

DIY Under-track Decoupler


You may also notice the control panel on the fascia, which while wired and powered up, is not quite hooked up to the Cobalt Blue switch motors; I will detail that a little more in my next post, though suffice to say, while completely unnecessary, I have decided to install them on all of my turnouts, just because they are cool and because I hate the look of the manual ground throws for N Scale. If you're wondering what the wires poking out of the track-work are, those are the feeds for the turnout frogs that have not yet been connected to the switch machines.

Currently I am working on building the first few structures (i'll show those in another post), and will start ballasting in a couple of weeks.

Thursday, 18 September 2014

Laying Track

After many, many months of planning and building bench-work the first section of track has been laid on the Southern and Central. It's been an expensive month! I don't even want to total up what I have spent, but it's well over $500! Eek....shhhh, don't tell the Mrs.

The section in question is the main line leading into the (as yet unnamed) lower deck terminal. Due to the issues surrounding Atlas and their supply of code 55 flex track, I have been forced to use sectional track for now, which actually hasn't been the biggest problem in the world, though I do wish I was using Peco code 55 since it is available in large supply from nearly everywhere. Much of the track I have managed to get my hands on has come from the US; thanks to Ebay and NZ Post's excellent US post forwarding service that they offer.

Track and track-bed is secured using white glue, with pushpins used to temporarily hold the sections in place as you can see in the pictures below. Once dry the push pins are removed the track is nice and secure. In the past I have used track pins, but to be honest I found them more trouble than they are worth, and inevitable I end up make a fist of it. Glue is a little more permanent, but then I am not planning on moving anything (hopefully).


Track glued and held in position with pushpins.


I am wiring for DCC, which I will be controlling using an NCE Powercab (again, thanks Ebay, effectively half the price it would have cost me had I bought it in NZ).

I love the walk-around controller, and the face plate which I can easily plug it into! I will definitely get some more panels for the other modules. Because the controller is not hard wired, when I am not using it, it can be safely secured, an added bonus. I will eventually pick up a pocket that it will sit in and attach it to the fascia.

The uncovered holes on the fascias will ultimately be covered by small control panels for turnout control; I am going to use aluminium or acrylic panels and micro switches. I will detail that further when I install my first turnout mechanism, which is probably going to be a cobalt switch machine, since they come from Australia and are a damn site cheaper than tortoise. I am still mulling over whether I will use the DCC versions or just the standard versions. It doesn't seem practical to control these from the powercab, so the DCC version just seems like overkill to me, but for an extra $3 it seems a shame to not use those instead.


Desk fits snugly under module! Note the holes in the fascia.

My next post will detail the wiring process a little more, since by then my trains will be here and running! How exciting...


Sunday, 31 August 2014

Completed Benchwork

After many weeks of bashing about in my garage, I can finally sit back and go ...phew!

All the benchwork for the Southern and Central (excluding the helix, which will be a project for next year) is now completed. Over the last couple of weeks I completed the 3rd module, which will model a fairly deep ravine and mountain side in the lower module and a bay in the upper module. 

Probably the biggest challenge was to get these modules to marry up, but with a bit of huffing and puffing they do, and pretty much perfectly, although I am not completely happy with the height of the upper valance, so in time I will add a wider valance.

The other issue I had to deal with was gradients. Because I wanted to get the lower deck main line as high as possible before reaching the helix module, thus eliminating some of the helix work, I used a gradient of about 3%, which isn't particularly high, but I didn't dare go any steeper than that. The branch line in the upper module has a gradient of about 4.5%, way too steep for any serious train lengths, but since it's a branch line I figured it would be ok. I plan for that line to connect to a coal mine or quarry.

While the plan is to now install these in the spare bedroom, I think before that I will start running the wiring beneath the layout, just because of the ease of access. I will be installing an NCE DCC system, so it's just a matter of running the bus wires underneath and adding suitable plugs and sockets between module. My next update will document how I've done that and hopefully will show the modules installed in my "train room"!

Wednesday, 30 July 2014

Backdrop

Sorry this is bit late, but took me longer than I had anticipated...that's becoming a bit of a theme I realize! My impatience to complete keeps writing checks that reality can't cash!

I am fairly happy with the completed backdrop, I think it came out well considering I have very limited artistic skills. All I can say is thank God for YouTube.


I thought I was ready to lay track, but my decision to go code 55 has bitten me on the bum, as Atlas have still not sorted out all of their manufacturing issues, in particular code 55 flex track is as scarce as hens teeth. I considered (briefly) going to Peco, but joining the pieces of Atlas that I have to Peco was going to be a pain as the rail profile is completely different.

So I guess for now I will probably start building the next module!

Short term I have some track, so I may start laying some of the yard track. I do want to draw out all the track and planned structures first, so that's something I will be doing over the next few weeks.

Sunday, 13 July 2014

Better Late Than Never

Well it's been a lot longer that I thought between posts, but finally I thought it was time to report some progress!

I am still working in the garage which is not ideal, a bit too cold at this time of the year, so not as much has been accomplished, well not as much as would have liked.

The bench work for the first 2 modules of my layout is now largely completed. I say largely, because there are a couple of minor things that need to be done such as fit castors to the legs which I have been putting off!

I am currently working on getting the backdrop right and this has been an ongoing mission. You can see from the picture that I have some basic hill shapes and the little dots are trees, all individually stamped with foam rubber cutouts. I still have a lot more trees to do, and I would love to get some clouds up on there. My intention was for it to just be a basic blue background, but it was not at all satisfactory so I have been teaching myself some rudimentary painting skills. I think it looks ok, though the picture does not do it justice, so I will take a couple of close up images next week and post them.

The other thing which I have completed is the coved corners, after all the world does not have corners! If you are wondering how I achieved it, well it was easy in the end. Some think cardboard, glued with contact adhesive and plastered over to hide the seam as much as possible. I think it came out as best as could be hoped and certainly looks a hundred times better than it was. I found the corners cast weird shadows that just ruined the effect!

By the way, the gap in the middle of the picture is where the modules join, can't be helped!

Over the next few weeks I will get the painting completed, the castors fitted and make some adjustments to the base itself for where there is a slight gradient (which I really should have planned for a lot earlier). Once that's done, I should finally be able to sneak the whole lot into the house....though now I am thinking about building the 3rd module since I am on a roll!

Sunday, 11 May 2014

My Rant

Time for a bit of a rant...and this is directed entirely at local hobby shops in New Zealand...though it might also apply to other countries.

I love this hobby, it's a lot of fun, but boy oh boy do I worry about its future. Every train show I go to I see less and less young people, of course what this means is there are less and less opportunities for products to be purchased, so hobby stores stock less, and ultimately manufacturers build less and sell at a higher price. It's a bit of a downward spiral.

So here is where the rant comes in. I walk into my local hobby shop, there are cars, planes and even boats hanging from the ceiling, but alas where are the trains? Well they are locked away from prying hands in cabinets and cupboards; there's no working layout, nothing, nada, zip....and I see this in nearly every hobby store I go into in this country. Hanging stuff off of your roof is fine when you want to put it somewhere after you've bought it, but pretty much useless if you're trying to sell it.

Wake up hobby stores! You are competing against Xbox, PlayStation and iPads! You are competing against a vast sea of competition online and most of all, you are doing the hobby a massive disservice. You need to make the products you sell more tactile, more exciting. Locking them up in cabinets is all fine and good to stop them being stolen, but then you might as well not unpack them at all from the shipping cartons!

My local store changed hands a few years back, the new owners clearly have little interest in model railroading...I know this, because whenever I visit, the owner is plonked down behind the counter working on (I assume his) remote controlled cars. I'm yet to ever see him actually out in front of the counter providing that invaluable thing called service and not once, ever has he smiled or uttered a single greeting as I entered. Is it any wonder then that I prefer to purchase online...not from them mind you, because this store (along with a good number of other hobby stores in NZ) deem the internet unworthy of their presence. Don't even get me started on the rampant overcharging...that's a whole new post in itself.

Before anyone says, "What do you know!", well I speak from experience. Before entering the dizzying, often confusing world of IT, I spent 20 years working in, managing and eventually owning my own retail stores and I now spend my days building eCommerce sites for retailers.

I, unfortunately, see a day when this hobby is but a distant relic of the past (as will be the little local hobby store) unless more effort is made to modernize and connect. Sadly, this is not a problem solely owned by hobby stores, but by nearly every niche retailer in existence. If you're going to run/own a retail store then you need to go and take a course at your local community college; customer service 101.

You all have this amazing point of difference...cool toys...every little kids dream! So use that point of difference, get the stuff out on display and get it working.

Heres a few ideas:
  • Build a small portable layout. Kids (and adults) will watch trains running for hours!
  • Hold regular work shops, designed especially for kids where they can come in and experience the real world instead of the virtual world. Show them how to build a model aeroplane, run a train, fly a plane...the options are endless!
... and lastly (and probably most importantly) stock some entry level stuff, cheap and cheerful, the sort of stuff that will pique interest without breaking the parents banks.

Saturday, 3 May 2014

Painted Module

I ummed and ahhed, and researched and read a lot about painting the background. In the end I decided to go with a simple light blue with wisps of white, representing clouds. Long term I may continue to add to the background with photo images and building flats, but for now I am quite happy with the way it came out. I'm a big believer in less is more, and I don't really want people to be looking at the background scenery anyway, so low key and believable is what I want.

The baseboards received a coat of flat light brown latex paint, eventually it will be hidden under ground cover, and whatever else gets plonked down, so won't matter too much. I will use the same brown to make a wash with for use later on.

I gave the benchwork a coat of black semi gloss latex paint, mainly because I wanted to really frame the two levels, and I think it is very effective. I've seen greens and browns used, but for me black, really draws the eye into where the action is happening. Once flouro lights are installed above the levels I think it will look really dramatic!

One thing I will say...wow, the price of paint! So to keep the cost down, I scrounged old leftover paint (thankgod for people who paint their kitchens sky blue...yes, you know who you are!) and purchased test pots, which is a much more cost effective option.

Painted module.


I may not post much over the next few weeks as I will be building the second module, and this will largely be a duplicate of what I have already written. Winter is on the way, so it will be a mad rush to get done so I can spend the cooler months inside.